Installation of all instrumentation for different systems, either electric and pneumatic sensors (more than 500 bilge level switches among others) and commissioning.
Installation of fire detection system, with more than 2.000 detectors, and commissioning.
Design, manufacturing and installation for electrolytic can to power supply 440Vac 6000A, using sea water.
On which we made all new electric & instrumentation installation for the new system, adding new power panels to Main Switchboard, and manufacturing, supply and mounting of new fans for the Scrubber new room.
New BWTS installation, being IESA in charge of electric installation, including wiring and connecting of new system equipment (distribution cabinets, control panels, pumps, instrumentation), and so integration of new system with existing electric system on board. Design, manufacturing and mounting of system new distribution switchboard and pump control panel.
New BWTS installation, being IESA in charge of electric installation, including wiring and connecting of new system equipment (distribution cabinets, control panels, pumps, instrumentation), and so integration of new system with existing electric system on board, lighting on new room, mounting and integration of new smoke detectors, manufacturing and mounting of system new distribution switchboards (440Vac, 230Vac and emergency), valves control panel with pneumatic control and pump control panel, pipes and tank electric heating.